PAR TYO Cart0

Collaborate — 02/05

Institutional rehabilitation

The Halle, a new beating heart for a university campus.

Institutional rehabilitation
Location
Gif-sur-Yvette
Program
Institutional
Surface
40,000 m²
Phase
Design-build
Context
SCAU
Role
Sole assistant
Team
S. Neves, F. Gillard

As the sole architectural assistant, I was responsible for liaising with the construction company during this design-build competition. I developed the proposal with the contractor, maintained a detailed understanding of the programme, and participated in the final competition presentation.

Our architectural position was to regroup the different uses around a new central point, the Halle, conceived as the “beating heart” of the campus. Flows, access and addressing were organised from this centre to restore cohesion, as students rarely encountered one another despite sharing the same campus.

The existing sports hall was transformed into a bright, open common space. Four Maisonnées were organised around the Halle, each addressing a different entity while allowing future flexibility of use. The design-build process integrated architectural design, technical feasibility and construction methods from the early stages.

(Next project — 03)Kohaku floating city